Which of the plants will take least time in starting from cold condition to full load operation

Electrical Engineering XYZ MCQs

Which of the plants will take least time in starting from cold condition to full load operation:

  1. Nuclear power plant
  2. Thermal power plant
  3. Gas turbine plant
  4. Hydroelectric power plant

Correct answer: 4. Hydroelectric power plant

Explanation: Hydroelectric power plants use the flow of water to drive turbines, generating electricity. Hydro power plants will take least time in starting from cold condition to full load operation.