Electrical Power Generation MCQs Part 37

Electrical Power Generation MCQs Part 37

In hydro power plant surge tank is located near

In hydro power plant surge tank is located near

  1. Dam
  2. Reservoir
  3. Transformer
  4. Turbine

Correct answer: 4. Turbine

Storage requirement in case of hydro power plants can be determined from

Storage requirement in case of hydro power plants can be determined from

  1. Hydro-graph
  2. Mass curve
  3. Both of these
  4. None of these

Correct answer: 3. Both of these

Water hammer is developed in a

Water hammer is developed in a

  1. Draft tube
  2. Penstock
  3. Surge tank
  4. Turbine

Correct answer: 2. Penstock

In thermal power plants, pressure in working fluid cycle is developed by

In thermal power plants, pressure in working fluid cycle is developed by:

  1. Condenser
  2. Feed water pump
  3. Super heater
  4. Turbine

Correct answer: 3. Super heater

Also see: Top 5 Advantages of Steam Power Station

Most economic load on overhead line is

Most economic load on overhead line is:

  1. Equal to natural load
  2. Less than natural load
  3. Greater than natural load
  4. None of these

Correct answer: 3. Greater than natural load