Electrical Power Generation MCQs Part 54

Electrical Engineering MCQs on Power Generation – Part 54

Generating capacity connected to the bus bars and ready to take load when switched on is termed as

Generating capacity connected to the bus bars and ready to take load when switched on is termed as

  1. Cold reserve
  2. Firm power
  3. Hot reserve
  4. Spinning reserve

Correct answer: 4. Spinning reserve

The major reason for low power factor is supply system is due to installation of

The major reason for low power factor is supply system is due to installation of

  1. DC Motors
  2. Induction motors
  3. Single phase motors
  4. Synchronous motors

Correct answer: 2. Induction motors

The power plant that can generate power at unpredictable or uncontrolled times

The power plant that can generate power at unpredictable or uncontrolled times

  1. Solar power plant
  2. Tidal power plant
  3. Wind power plant
  4. Any of these

Correct answer: 4. Any of these

Which of following will offer the least load

Which of following will offer the least load

  1. Electric shaver
  2. Hair dryer
  3. Television
  4. Vacuum cleaner

Correct answer: 1. Electric shaver

A consumer has to pay lesser fixed charges in case of

A consumer has to pay lesser fixed charges in case of

  1. Flat rate tariff
  2. Maximum demand tariff
  3. Two part tariff
  4. Same in all of these

Correct answer: 2. Maximum demand tariff

Leave a Reply