Electrical Power Generation MCQs Part 3
Electrical power generation MCQ Part 3.
Contents
The water stored in the dam is referred as
a. The water stored in the dam is referred as:
- Grill
- Pondage
- Damage
- Gate
Correct answer: 2. Pondage
The quality of diesel engine fuel is rated in terms of
b. The quality of diesel engine fuel is rated in terms of:
- Octane number
- Cetane number
- Bondage number
- None of these
Correct answer: 2. Cetane number
Compare to medium hear Hydroelectric plant, a _________ head plant required more amount of water to generate same energy
c. Compare to medium hear Hydroelectric plant, a _________ head plant required more amount of water to generate same energy:
- Low
- High
Correct answer: 1. Low
After passing through turbine the water is discharged in to
d. After passing through turbine the water is discharged in to:
- Surge tank
- Tailrace
- Forebay
- Reservoir
Correct answer: 2. Tail race
The problem of noise is most eminent in __________________
e. The problem of noise is most eminent in __________________:
- Nuclear power station
- Diesel power station
- Hydroelectric power station
- Steam power station
Correct answer: 2. Steam power station
Hydroelectric power plants are used as
f. Hydroelectric power plants are used as:
- Baseload plants
- Peak load plants
- Both of these
- None of these
Correct answer: 1. Baseload plants
Coal power station works on
g. Coal power station works on:
- Atkinson cycle
- Rankine cycle
- Otto cycle
- Miller cycle
Correct answer: 2. Rankine cycle
The correct statement about hydroelectric power stations
h. The correct statement about hydroelectric power stations:
- The operating cost is low whereas initial cost is high
- Both operating and initial costs are high
- Both operating and initial costs are low
- The operating cost is high, whereas the initial cost is low
Correct answer: 1. The operating cost is low whereas initial cost is high
The power plant which is usually employed in the emergency conditions is
i. The power plant which is usually employed in the emergency conditions is:
- Hydroelectric power station
- Diesel power station
- Tidal unit station
- Steam power station
Correct answer: 2. Diesel power station
Which one of the following can be referred as unpredictive source
j. Which one of the following can be referred as unpredictive source:
- Wind
- Water
- Nuclear
- Coal
Correct answer: 1. Wind
Continue reading
- Electrical power generation MCQs Part 1
- Electrical power generation MCQs Part 2
- Electrical power generation MCQs Part 3
- Electrical power generation MCQs Part 4
- Electrical power generation MCQs Part 5
- Electrical power generation MCQs Part 6
- Electrical power generation MCQs Part 7
- Electrical power generation MCQs Part 8
- Electrical power generation MCQs Part 9
- Electrical power generation MCQs Part 10